Section 26 MID FUSE LOWER STRUCTURE

Got started on section 26 this weekend. There seems to be a lot of parts, and I will not follow the instruction sequentially. It's better to prepare all parts and get them primed. It's good to have the instructions in PDF so I can search for the different parts number as start deburring. If they for example needs countersinking or match drilling, I'll do that at the same time as the deburring.
Section 26 covers the area from the aft fuselage to the center section. That means baggage and seating area.
Quite a lot of parts picked. Next is to remove the plastic.

Working on separation and deburring of the small parts. The intentions
is to the divide the priming into two. One with small parts and then all the ribs (20+).

Just a lot of tedious work, but I hope all small parts
should be ready for priming tomorrow. Then priming on
Tuesday. 

Comments