Section 26 MID FUSE LOWER STRUCTURE
Got started on section 26 this weekend. There seems to be a lot of parts, and I will not follow the instruction sequentially. It's better to prepare all parts and get them primed. It's good to have the instructions in PDF so I can search for the different parts number as start deburring. If they for example needs countersinking or match drilling, I'll do that at the same time as the deburring.
![]() |
Section 26 covers the area from the aft fuselage to the center section. That means baggage and seating area. |
Quite a lot of parts picked. Next is to remove the plastic. |
Working on separation and deburring of the small parts. The intentions is to the divide the priming into two. One with small parts and then all the ribs (20+). |
Just a lot of tedious work, but I hope all small parts should be ready for priming tomorrow. Then priming on Tuesday. |