Empennage completed

Image
Then the tail cone is finished and thereby the the whole empennage can be declared as completed as far as possible at this time. Sadly the fuselage and finishing kit will not arrive in another 2-3 weeks. Wires, heath shrinks, sleeving and solder sleeves came in from Prowire USA. This is how the shrink labels will look like on the wire I made this tool for wire cutting. Worked great. All wiring and system routing completed. Close up of the left static port and wiring from the tail. This is how I made the platform for the bucking helper. Happy wife😁 got to help me. Just a few more rivets to go.  All done😀 I decided to redo the elevator trim cable (the on supplied by Vans) from the tail to the elevator. Basically because I use cold plated pins on the one on the fuselage. The container is now complete with ventilation for priming. All empennage parts stored in the container.

Slow progress on the aft fuselage

Image
As I've been busy with the container, and also having some summer vacation, the building progress has been slow. But today I completed section 10-30 step 1 - dimpling of the top side skins . The side skin riveting is already complete. Next now is the attach all the nut plates, the rudder cable,  pitot static and UAT and ELT antenna cable. The rest of the wiring will be done later, as I will build my own harness and don't use the supplied ones. I'm preparing the wiring circuits in an spreadsheet, and will order wires as soon as I have an approx calculation of how much I need of the different types, sizes and colors. Nice weather today, so I moved outside.

Aft fuselage progress

Image
It's has been while since last post due to holiday and work traveling. But I've had progress on the aft fuselage in between. The picture below show the status. Bottom skin is finished, and left side skin is riveted. Right side skin is clecoed on and partially riveted. Static port I decided to go for the  AVERY EFIS SYSTEM PLUMBING KIT instead of the supplied one in  the empennage kit. Then I have all I need for the AOA plumbing as well. The supplied ports. I drilled to holes and countersunk them for AN426 rivets. The ports fits nicely to the skin after opening the hole to the correct size. More pictures A happy wife helping setting rivets😀

Aft fuselage

Image
After some more fairing work, I continued on to the aft fuselage. First parts found and ready for deburring. The aft most frames clecoed onto the bottom skin All structural part ready for priming. I'll do the priming in 3-4 session. My paint boot is small and the large skins will be difficult to handle. Cleavelands Tight Fit Dimpling Fixture and the male die on the rivet gun. This was necessary on the two aft frames because the web are bent beyond 90 degree and therefore impossible to reach with the squeezer. All holes against the skin on the C channel longerons has to be countersunk. The bottom is deburred and ready for etching and priming. I've built a cradle to hold the HS, VS, elevator and rudder. They are now complete.