Slow progress on the aft fuselage
As I've been busy with the container, and also having some summer vacation, the building progress has been slow. But today I completed section 10-30 step 1 - dimpling of the top side skins.
The side skin riveting is already complete.
Next now is the attach all the nut plates, the rudder cable, pitot static and UAT and ELT antenna cable. The rest of the wiring will be done later, as I will build my own harness and don't use the supplied ones. I'm preparing the wiring circuits in an spreadsheet, and will order wires as soon as I have an approx calculation of how much I need of the different types, sizes and colors.
The side skin riveting is already complete.
Next now is the attach all the nut plates, the rudder cable, pitot static and UAT and ELT antenna cable. The rest of the wiring will be done later, as I will build my own harness and don't use the supplied ones. I'm preparing the wiring circuits in an spreadsheet, and will order wires as soon as I have an approx calculation of how much I need of the different types, sizes and colors.
Nice weather today, so I moved outside. |
It is slowly materializing as an aircraft! It will be fun following the painstaking slow process of building/assembling the thousands of parts.