Section 25 completed

Today section 25 was completed on approx 28 hours.

All parts scuffed, cleaned and ready for priming.

Finished.

The aft bulkhead (F-01405A).


Ready to rivet the side channels to the aft bulkhead.
I almost made a mistake here as I initially had attached
the bulkhead upside down. But I noticed because some
rivets then would have been impossible to set.

The bulkhead bar is bolted on.

This is the aft bulkhead (F-01404) of the two center section bulkheads.

And this is the forward center section bulkhead (F-01403). This is the area were the
controls stick will be.