Gear leg and wheel fairings and oil door

Most of the fairing works is now done, and I'm leaving for 2 weeks holiday. When back I'll complete the rest of the work on the firewall forward and then start on the paint job. The paint should arrive in beginning of July, and the ventilation fan and filters about the same time.














Oil door

I decided to convert the oil door supplied,  to use a spring loaded hinge with a Cessna latch. 
I got the hinge and latch (KM610-64) from Aircraft Spruce.







Comments