Good progress on section 29 (mid fuselage side structures)
All parts are prepared (deburred and primed), so it's mostly riveting work left to finish this long and comprehensive section. Next is aft fuselage attachment, and that will be exiting and a milestone.
Picture from today. Most of the rivets set on the left side. |
The side skin was a bit long for my paint booth, so had to use the diagonal. |
Primed. |
Some parts are back riveted on before attaching to the fuselage. |
Mixing ChemSeal (1:10). The small cartridges are bought from Aircraft Spruce but are intended to mix all at once. That gives a lot of waste, so I tried to mix it manually on my scale. It works great and eases the work were sealant is required. |
Comments
Post a Comment