Section 29 progress
I've completed section 29-02 to 29-07 and is working on 29-08 (attaching the skin and cowling). In addition parts have been deburred and primed ahead.
The control column assembly is in place. It took some time to get the shims correctly. |
Lower logeron were the engine mount will be attached. |
The upper longeron must be twisted 10 degree. |
Parts primed but needed some touch up. |
I decided to fabricate a trolley with wheel, to easily be able to move the fuselage in and out of the container. |
I also made a ramp (not shown on the picture) |
The left side skin is hang on. |