I've completed section 29-02 to 29-07 and is working on 29-08 (attaching the skin and cowling). In addition parts have been deburred and primed ahead. 

The control column assembly is in place. It took some time
to get the shims correctly.



Lower logeron were the engine mount will be attached.

The upper longeron must be twisted 10 degree.

Parts primed but needed some touch up.

I decided to fabricate a trolley with wheel, to easily be able
to move the fuselage in and out of the container.

I also made a ramp (not shown on the picture)

The left side skin is hang on.