Inspection, completion of vertical stabilizer, and progress on rudder

Today I had the first visit from Gunnar Iversen to check my work so far on the vertical stabilizer and the rudder. He was happy so I could proceed to close both.

Vertical stabilizer

I did rivet the the aft spar onto the rest of the structure with no major problem. Except that is's a bit difficult to reach the 4 AD426 along the middle hinge bracket. I managed it by using the angled side of the tungsten bucking bar from the Cleaveland tool kit. Also the two outer AN470AD4 rivets on to the root rib was a bit difficult to rivet and hold together at the same time.




Rudder

The rudder is ready for riveting, but I can't proceed before the double sided tape (3M F9460PC) for the trailing edge arrives. That should be on Tuesday.
The trailing edge was countersinked with the special countersinker
from Cleaveland tools.

The skin is ready for riveting.
I've also 3D printed the templates to form the leading
edge. I got them from the PDF version of the drawings (07-13)


Comments