Posts

Showing posts from August, 2019

Empennage completed

Image
Then the tail cone is finished and thereby the the whole empennage can be declared as completed as far as possible at this time. Sadly the fuselage and finishing kit will not arrive in another 2-3 weeks. Wires, heath shrinks, sleeving and solder sleeves came in from Prowire USA. This is how the shrink labels will look like on the wire I made this tool for wire cutting. Worked great. All wiring and system routing completed. Close up of the left static port and wiring from the tail. This is how I made the platform for the bucking helper. Happy wife😁 got to help me. Just a few more rivets to go.  All done😀 I decided to redo the elevator trim cable (the on supplied by Vans) from the tail to the elevator. Basically because I use cold plated pins on the one on the fuselage. The container is now complete with ventilation for priming. All empennage parts stored in the container.