Aft fuselage
After some more fairing work, I continued on to the aft fuselage. First parts found and ready for deburring. The aft most frames clecoed onto the bottom skin All structural part ready for priming. I'll do the priming in 3-4 session. My paint boot is small and the large skins will be difficult to handle. Cleavelands Tight Fit Dimpling Fixture and the male die on the rivet gun. This was necessary on the two aft frames because the web are bent beyond 90 degree and therefore impossible to reach with the squeezer. All holes against the skin on the C channel longerons has to be countersunk. The bottom is deburred and ready for etching and priming. I've built a cradle to hold the HS, VS, elevator and rudder. They are now complete.